35.12 — Transmission of electricity

NACE Rev. 2 35.12 (Transmission of electricity) classifies within economic division 35 (Regulated under EU Electricity Reg), linking EU/UN activity boundaries with US NAICS, UK SIC, and national regulatory obligations.

01 / Standard & Revision
NACE Rev. 2

Eurostat • v2.0

02 / Parent Hierarchy
35.1

Electric power generation, transmission and distribution

03 / Mapped Standards
10

NAICS 221111 • SIC 35120

04 / Subclasses & Scope
1 Items

MCC 4900

01 / OFFICIAL SCOPE & OPERATORS

Activity Scope, Operators & Exclusions

Who Uses This Code & Typical Business Models

  • Solar (PV), wind, hydro, geothermal, and thermal power generation plants
  • Electricity and natural gas transmission, distribution, and trading utilities
  • District heating, chilled water, and industrial steam suppliers

This Class Includes

1
  • operation of transmission systems that convey the electricity from the generation facility to the distribution system

This Class Excludes (Cross-References)

0

—

02 / REGULATORY & TAX DOSSIER

Legislation, Licensing, Incorporation & Tax Framework

Div. 35 • Sec. D

Governing Statutes & Regulations

Electricity Market Law No. 6446 Natural Gas Market Law No. 4646 Renewable Energy Law No. 5346 (YEKDEM) OHS Law No. 6331 (High Voltage / Height)

Mandatory Permits, Licenses & Authorities

  • EMRA (EPDK) Generation, Distribution, or Supply License (or Distributor Call Letter for unlicensed self-consumption PV)
  • EPİAŞ/TEİAŞ grid connection & market registration
  • EIA clearance and High-Voltage Electrical Operations Engineer sign-off

Incorporation Route & Chamber Registration

EU NACE Rev. 2.1 Framework
Regulated under EU Electricity Reg. 2019/943, REMIT wholesale integrity rules, RED III, and directly qualifies under EU Taxonomy Climate Mitigation criteria (2021/2139) for clean renewables.
United States (IRS / SBA / NAICS)
Maps to NAICS 2211/2212. Regulated by FERC, NERC reliability standards, and state PUCs; renewable plants claim IRA Investment/Production Tax Credits (ITC/PTC).
United Kingdom (Companies House / HMRC)
Licensed by Ofgem under Electricity/Gas Acts, alongside CfD renewable auctions and UK ETS compliance under UK SIC 35xxx.

VAT, Withholding & Statutory Incentives

  • Renewable power plants receive Investment Incentive machinery VAT relief (subject to domestic panel/equipment rules).
  • Wholesale power/gas sales carry EPİAŞ balancing rules and 20% standard VAT (MCC 4900 utility acquiring tier).

Cross-Border Regulatory Frameworks (EU / US / UK)

TR • Corporate & Tradesmen Registry

Chamber of Commerce / Industry (JSC/LLC legally required for EMRA licenses) — Individuals limited to rooftop self-consumption; licensed generation/trading requires a corporation.

EU / Global Technical Alignment

Regulated under EU Electricity Reg. 2019/943, REMIT wholesale integrity rules, RED III, and directly qualifies under EU Taxonomy Climate Mitigation criteria (2021/2139) for clean renewables.

AUDIT & BOUNDARY CHECK

Classification Boundaries & Audit Risks

  • EPC construction of a solar/wind farm sits in 42.22/43.21; owning and selling electricity belongs in Div. 35.
  • Grid export without EMRA/Ofgem/FERC connection consent is unlawful.
04 / INTERNATIONAL CROSSWALK & MCC

Global Classification Passport

Verified structural and concordance mappings across EU, US, UK, UN, and national registries.

Payment Processing & ISO 18245 MCC Profile

Visa / Mastercard ISO 18245
MCC 4900
Regulated / Licensed KYB
Utilities — Electric, Gas, Water, Sanitary

Dedicated utility rate tier restricted to licensed energy, water, and waste operators.

05 / BOUNDARIES & COMPARISON

Critical Distinctions & Sibling Codes

Open Full Comparison Tool →

Critical Regulatory & Scope Boundaries vs. Adjacent Codes

Critical Regulatory & Scope Boundaries vs. Adjacent Codes
Compared CodeScope BoundaryRegulatory & Tax Impact
42.22 — Utility Power Plant Civil EPC → Generating and selling electricity is 35.12; EPC construction of solar/wind projects for owners is 42.22/43.21.EPC builders face construction tax/withholding rules whereas 35.12 operators follow utility energy licensing.
06 / TAXONOMY TREE

Classification Hierarchy & Data Export

07 / FAQ

Frequently Asked Questions

What business activities and models fall under NACE Rev. 2 35.12?

35.12 (Transmission of electricity): operation of transmission systems that convey the electricity from the generation facility to the distribution system. Typical operators: Solar (PV), wind, hydro, geothermal, and thermal power generation plants; Electricity and natural gas transmission, distribution, and trading utilities.

What regulatory licensing and tax rules apply to 35.12 across EU, US, UK, or Turkey?

EU: Regulated under EU Electricity Reg. 2019/943, REMIT wholesale integrity rules, RED III, and directly qualifies under EU Taxonomy Climate Mitigation criteria (2021/2139) for clean renewables. US: Maps to NAICS 2211/2212. Regulated by FERC, NERC reliability standards, and state PUCs; renewable plants claim IRA Investment/Production Tax Credits (ITC/PTC). UK: Licensed by Ofgem under Electricity/Gas Acts, alongside CfD renewable auctions and UK ETS compliance under UK SIC 35xxx.

How does 35.12 differ legally from 42.22 (42.22 — Utility Power Plant Civil EPC)?

Generating and selling electricity is 35.12; EPC construction of solar/wind projects for owners is 42.22/43.21. Regulatory impact: EPC builders face construction tax/withholding rules whereas 35.12 operators follow utility energy licensing.

What are the international classification equivalents and MCC code for 35.12?

Verified concordance for 35.12: US NAICS 2022: 221111 (Hydroelectric Power Generation), 221112 (Fossil Fuel Electric Power Generation), 221113 (Nuclear Electric Power Generation) • UK SIC 2007: 35120 (Transmission of electricity) • Payment MCC 4900 (Utilities — Electric, Gas, Water, Sanitary).

What replaces legacy NACE Rev. 2 code 35.12 in NACE Rev. 2.1?

In the 2025–2026 NACE Rev. 2.1 revision, 35.12 transitions to 35.13 (Transmission of electricity).