35.12 — Production of electricity from renewable sources
Split cleanly in NACE Rev. 2.1 from fossil generation (35.11), Code 35.12 covers exclusively renewable electricity generation (Solar PV, Wind, Hydro, Geothermal) — eligible under EU Taxonomy green criteria, US IRA ITC/PTC tax credits, and Turkey’s EPDK YEKDEM/unlicensed rules.
Eurostat • v2.1
Electric power generation, transmission and distribution
NAICS 221111 • SIC 35110 • ISIC 3512
MCC 4900
Activity Scope, Operators & Exclusions
Who Uses This Code & Typical Business Models
- Solar (PV), wind, hydro, geothermal, and thermal power generation plants
- Electricity and natural gas transmission, distribution, and trading utilities
- District heating, chilled water, and industrial steam suppliers
This Class Includes
1- operation of generation facilities that produce electricity from renewable sources (e.g. gaseous biofuels, hydropower, on-shore and off-shore wind power, photovoltaic solar energy, thermal solar energy, geothermal energy, and tide, wave and ocean energy)
This Class Excludes (Cross-References)
3- production of electricity from non-renewable sources, see 35.11
- production of electricity as part of the storage of electricity activities, see 35.16
- pretreatment of waste for energy recovery, see 38.22
Legislation, Licensing, Incorporation & Tax Framework
Governing Statutes & Regulations
Mandatory Permits, Licenses & Authorities
- EMRA (EPDK) Generation, Distribution, or Supply License (or Distributor Call Letter for unlicensed self-consumption PV)
- EPİAŞ/TEİAŞ grid connection & market registration
- EIA clearance and High-Voltage Electrical Operations Engineer sign-off
Incorporation Route & Chamber Registration
- EU NACE Rev. 2.1 Framework
- Regulated under EU Electricity Reg. 2019/943, REMIT wholesale integrity rules, RED III, and directly qualifies under EU Taxonomy Climate Mitigation criteria (2021/2139) for clean renewables.
- United States (IRS / SBA / NAICS)
- Maps to NAICS 2211/2212. Regulated by FERC, NERC reliability standards, and state PUCs; renewable plants claim IRA Investment/Production Tax Credits (ITC/PTC).
- United Kingdom (Companies House / HMRC)
- Licensed by Ofgem under Electricity/Gas Acts, alongside CfD renewable auctions and UK ETS compliance under UK SIC 35xxx.
VAT, Withholding & Statutory Incentives
- Renewable power plants receive Investment Incentive machinery VAT relief (subject to domestic panel/equipment rules).
- Wholesale power/gas sales carry EPİAŞ balancing rules and 20% standard VAT (MCC 4900 utility acquiring tier).
Cross-Border Regulatory Frameworks (EU / US / UK)
Chamber of Commerce / Industry (JSC/LLC legally required for EMRA licenses) — Individuals limited to rooftop self-consumption; licensed generation/trading requires a corporation.
Regulated under EU Electricity Reg. 2019/943, REMIT wholesale integrity rules, RED III, and directly qualifies under EU Taxonomy Climate Mitigation criteria (2021/2139) for clean renewables.
Classification Boundaries & Audit Risks
- EPC construction of a solar/wind farm sits in 42.22/43.21; owning and selling electricity belongs in Div. 35.
- Grid export without EMRA/Ofgem/FERC connection consent is unlawful.
Turkish 6-Digit NACE Subclasses & OHS Hazard Classes
| 6-Digit Code | Official Turkish Activity Definition | OHS Hazard | Office / Location | Guide |
|---|---|---|---|---|
| Yenilenebilir kaynaklardan elektrik üretimi | Very Hazardous (Çok Tehlikeli) | Fiziki İşyeri ve Belediye Ruhsatı Şart | Inspect → |
Global Classification Passport
Verified structural and concordance mappings across EU, US, UK, UN, and national registries.
Electric power generation activities from renewable sources
Payment Processing & ISO 18245 MCC Profile
Visa / Mastercard ISO 18245Dedicated utility rate tier restricted to licensed energy, water, and waste operators.
Critical Distinctions & Sibling Codes
Critical Regulatory & Scope Boundaries vs. Adjacent Codes
| Compared Code | Scope Boundary | Regulatory & Tax Impact |
|---|---|---|
| 42.22 — Utility Power Plant Civil EPC → | Generating and selling electricity is 35.12; EPC construction of solar/wind projects for owners is 42.22/43.21. | EPC builders face construction tax/withholding rules whereas 35.12 operators follow utility energy licensing. |
35.11 — Production of electricity from non-renewable sources
Official NACE Rev. 2.1 code 35.11: operation of generation facilities that produce electricity from non-renewable sources (e.g. natural gas, coal and other fossil fuels), and from emission-free non-renewable sources (...
35.13 — Transmission of electricity
Official NACE Rev. 2.1 code 35.13: operation of high-voltage transmission systems that convey electricity from the generation facility to the distribution system
35.14 — Distribution of electricity
Official NACE Rev. 2.1 code 35.14: operation of high-voltage, medium-voltage and low-voltage distribution systems (e.g. lines, poles, meters and wiring), which convey electric power received from the generation facili...
Classification Hierarchy & Data Export
- D Electricity, gas, steam and air conditioning supply
- 35 Electricity, gas, steam and air conditioning supply
- 35.1 Electric power generation, transmission and distribution
- 35.12 Production of electricity from renewable sources
Frequently Asked Questions
What business activities and models fall under NACE Rev. 2.1 35.12?
35.12 (Production of electricity from renewable sources): operation of generation facilities that produce electricity from renewable sources (e.g. gaseous biofuels, hydropower, on-shore and off-shore wind power, photovoltaic solar energy, thermal solar energy, geothermal energy, and tide, wave and ocean energy). Typical operators: Solar (PV), wind, hydro, geothermal, and thermal power generation plants; Electricity and natural gas transmission, distribution, and trading utilities.
What regulatory licensing and tax rules apply to 35.12 across EU, US, UK, or Turkey?
EU: Regulated under EU Electricity Reg. 2019/943, REMIT wholesale integrity rules, RED III, and directly qualifies under EU Taxonomy Climate Mitigation criteria (2021/2139) for clean renewables. US: Maps to NAICS 2211/2212. Regulated by FERC, NERC reliability standards, and state PUCs; renewable plants claim IRA Investment/Production Tax Credits (ITC/PTC). UK: Licensed by Ofgem under Electricity/Gas Acts, alongside CfD renewable auctions and UK ETS compliance under UK SIC 35xxx.
How does 35.12 differ legally from 42.22 (42.22 — Utility Power Plant Civil EPC)?
Generating and selling electricity is 35.12; EPC construction of solar/wind projects for owners is 42.22/43.21. Regulatory impact: EPC builders face construction tax/withholding rules whereas 35.12 operators follow utility energy licensing.
What are the international classification equivalents and MCC code for 35.12?
Verified concordance for 35.12: US NAICS 2022: 221111 (Hydroelectric Power Generation), 221112 (Fossil Fuel Electric Power Generation), 221113 (Nuclear Electric Power Generation) • UK SIC 2007: 35110 (Production of electricity) • UN ISIC Rev. 5: 3512 • Payment MCC 4900 (Utilities — Electric, Gas, Water, Sanitary).
What was 35.12 under legacy NACE Rev. 2?
Under official Eurostat concordance, NACE Rev. 2.1 35.12 corresponds to NACE Rev. 2 35.11 (Production of electricity).
Which activities are excluded from NACE Rev. 2.1 35.12?
Official explanatory notes exclude: production of electricity from non-renewable sources, see 35.11; production of electricity as part of the storage of electricity activities, see 35.16; pretreatment of waste for energy recovery, see 38.22.