Skip to content
NACE Rev. 2.1 43.13 Active Rev. 2.1 43.1 ↗
● Official Registry Data: 2026-11-19

43.13 — Test drilling and boring

Official NACE Rev. 2.1 code 43.13: test drilling, test boring and core sampling for construction, geophysical, geological or similar purposes

01 / Standard & Revision
NACE Rev. 2.1

Eurostat • v2.1

02 / Parent Hierarchy
43.1

Demolition and site preparation

03 / Mapped Standards
9

NAICS 213113 • SIC 43130 • ISIC 431

04 / Subclasses & Scope
1 TR Subclasses

MCC 1711

Active Rev. 2.1Supersedes NACE Rev. 2:
01 / OFFICIAL SCOPE

Activity Scope, Inclusions & Exclusions

This Class Includes

1
  • test drilling, test boring and core sampling for construction, geophysical, geological or similar purposes

This Class Excludes (Cross-References)

7
02 / INTERNATIONAL CROSSWALK

Global Classification Passport

Verified structural and concordance mappings across EU, US, UK, UN, and national registries.

03 / NATIONAL EXTENSION

Turkish 6-Digit NACE Subclasses & OHS Hazard Classes

1
Turkish 6-Digit NACE Subclasses & OHS Hazard Classes
6-Digit CodeOfficial Turkish Activity DefinitionOHS HazardOffice / LocationGuide
43.13.01
Test sondajı ve delme (madencilikle bağlantılı olarak gerçekleştirilen test sondajı hariç)Very Hazardous (Çok Tehlikeli)Fiziki İşyeri ve Belediye Ruhsatı ŞartInspect →
04 / SIDE-BY-SIDE

Compare Related & Sibling Codes

Open Full Comparison Tool →
43.13 vs 43.21

43.21 — Electrical installation

Official NACE Rev. 2.1 code 43.21: installation of: electrical wiring and fittings ; telecommunication wiring ; computer network and cable television wiring, including fibre-optic ; satellite dishes ; lighting systems...

05 / TAXONOMY TREE

Classification Hierarchy & Data Export

06 / FAQ

Frequently Asked Questions

What business activities does NACE Rev. 2.1 code 43.13 cover?

43.13 (Test drilling and boring) covers: test drilling, test boring and core sampling for construction, geophysical, geological or similar purposes.

What are the US NAICS and UK SIC equivalents for 43.13?

Cross-standard concordance for 43.13: US NAICS 2022: 213113 (Support Activities for Coal Mining), 213114 (Support Activities for Metal Mining), 213115 (Support Activities for Nonmetallic Minerals (except Fuels) Mining) • UK SIC 2007: 43130 (Test drilling and boring) • UN ISIC Rev. 5: 431.

What was 43.13 under legacy NACE Rev. 2?

According to the official Eurostat correspondence table, NACE Rev. 2.1 class 43.13 maps from legacy NACE Rev. 2 code(s): 43.13 (Test drilling and boring).

Which activities are excluded from NACE Rev. 2.1 43.13?

Official explanatory notes exclude: drilling of production oil or gas wells, see 06.10 , 06.20; test drilling, associated with extraction of petroleum or gas, see 09.10; test drilling and boring support services (e.g. associated with mining activities), see 09.90.