43.24 — Other construction installation
NACE Rev. 2.1 43.24 (Other construction installation) classifies within economic division 43 (Regulated by EU F-Gas certification (heat-pump & HVAC installers), EPBD renewable installer standards, and Asbestos/Construction directives), linking EU/UN activity boundaries with US NAICS, UK SIC, and national regulatory obligations.
Eurostat • v2.1
Electrical, plumbing and other construction installation activities
NAICS 238290 • SIC 43290 • ISIC 432
MCC 1711
Activity Scope, Operators & Exclusions
Who Uses This Code & Typical Business Models
- Demolition, excavation, piling, and site-preparation subcontractors
- Electrical wiring, plumbing, HVAC, fire-sprinkler, and solar-panel installers
- Plastering, drywall, tiling, roofing, glazing, and exterior insulation trades
This Class Includes
5- installation in buildings or other construction projects of: elevators, escalators, including stairlifts ; automated and revolving doors ; lightning conductors ; vacuum cleaning systems ; blinds and awnings
- installation of fences, railings and fire escape staircases
- installation of signs, whether illuminated or not
- installation and replacement of locks
- installation of automatic systems on buildings (e.g. for opening windows and doors)
Also Includes
- installation of equipment for the personal safety of builders (e.g. to secure lifelines)
This Class Excludes (Cross-References)
1- installation of industrial machinery, see 33.20
Legislation, Licensing, Incorporation & Tax Framework
Governing Statutes & Regulations
Mandatory Permits, Licenses & Authorities
- Mandatory MYK Vocational Qualification Certificates (Law 6331 Art. 17) across electrical, plumbing, scaffolding, and finishing trades
- Local Gas Distributor Certified Installer License for 43.22 gas piping & boiler hooks
- Ministry Demolition Contractor Certificate (Y1/Y2/Y3) & Municipal Demolition Permit for 43.11
Incorporation Route & Chamber Registration
- EU NACE Rev. 2.1 Framework
- Regulated by EU F-Gas certification (heat-pump & HVAC installers), EPBD renewable installer standards, and Asbestos/Construction directives.
- United States (IRS / SBA / NAICS)
- Maps to NAICS 238. Requires state trade licenses (Electrical/Plumbing/HVAC), EPA Section 608 refrigerant handling certs, and OSHA Fall Protection.
- United Kingdom (Companies House / HMRC)
- Requires HMRC CIS, statutory Gas Safe Register (for gas fitting), NICEIC/Part P electrical certification, and F-Gas compliance under UK SIC 43xxx.
VAT, Withholding & Statutory Incentives
- Construction subcontracting above statutory thresholds triggers 4/10 VAT withholding; check labor invoice rules under Law 5510 Art. 85.
- Sole traders in specialized trades can incorporate rapidly, though every site team needs OHS Law 6331 compliance.
Cross-Border Regulatory Frameworks (EU / US / UK)
Chamber of Commerce / Industry — Electrical / Plumbing / Building Tradesmen Chamber (Law 5362)
Regulated by EU F-Gas certification (heat-pump & HVAC installers), EPBD renewable installer standards, and Asbestos/Construction directives.
Classification Boundaries & Audit Risks
- Installing third-party doors, HVAC units, or flooring belongs in Div. 43; manufacturing them in your own plant sits in Div. 25/31.
- Carrying out gas work without distributor/Gas Safe authorization or wiring without certified electricians triggers immediate shutdowns.
Turkish 6-Digit NACE Subclasses & OHS Hazard Classes
| 6-Digit Code | Official Turkish Activity Definition | OHS Hazard | Office / Location | Guide |
|---|---|---|---|---|
| Asansörlerin, yürüyen merdivenlerin, yürüyen yolların, otomatik ve döner kapıların onarım ve bakımı dahil kurulum işleri | Very Hazardous (Çok Tehlikeli) | Fiziki İşyeri ve Belediye Ruhsatı Şart | Inspect → | |
| Parmaklık ve korkuluk tesisatı işleri (metal yangın merdivenlerinin kurulumu dahil) | Very Hazardous (Çok Tehlikeli) | Fiziki İşyeri ve Belediye Ruhsatı Şart | Inspect → | |
| Başka yerde sınıflandırılmamış diğer tesisat işleri | Very Hazardous (Çok Tehlikeli) | Fiziki İşyeri ve Belediye Ruhsatı Şart | Inspect → |
Global Classification Passport
Verified structural and concordance mappings across EU, US, UK, UN, and national registries.
Parmaklık ve korkuluk tesisatı işleri (metal yangın merdivenlerinin kurulumu dahil)
Electrical, plumbing and other construction installation activities
Payment Processing & ISO 18245 MCC Profile
Visa / Mastercard ISO 18245Smooth POS approval when paired with signed work orders or completion receipts.
Critical Distinctions & Sibling Codes
43.21 — Electrical installation
Official NACE Rev. 2.1 code 43.21: installation of: electrical wiring and fittings ; telecommunication wiring ; computer network and cable television wiring, including fibre-optic ; satellite dishes ; lighting systems...
43.22 — Plumbing, heat and air-conditioning installation
Official NACE Rev. 2.1 code 43.22: installation, repair and maintenance of: heating systems (e.g. heat pumps, solar thermal collectors) ; furnaces, cooling towers ; plumbing and sanitary equipment ; ventilation and ai...
43.23 — Installation of insulation
Official NACE Rev. 2.1 code 43.23: thermal insulation works (e.g. for pipes, boilers and ducts, interior or exterior, including cladding for insulation)
Classification Hierarchy & Data Export
- F Construction
- 43 Specialised construction activities
- 43.2 Electrical, plumbing and other construction installation activities
- 43.24 Other construction installation
Frequently Asked Questions
What business activities and models fall under NACE Rev. 2.1 43.24?
43.24 (Other construction installation): installation in buildings or other construction projects of: elevators, escalators, including stairlifts ; automated and revolving doors ; lightning conductors ; vacuum cleaning systems ; blinds and awnings; installation of fences, railings and fire escape staircases; installation of signs, whether illuminated or not. Typical operators: Demolition, excavation, piling, and site-preparation subcontractors; Electrical wiring, plumbing, HVAC, fire-sprinkler, and solar-panel installers.
What regulatory licensing and tax rules apply to 43.24 across EU, US, UK, or Turkey?
EU: Regulated by EU F-Gas certification (heat-pump & HVAC installers), EPBD renewable installer standards, and Asbestos/Construction directives. US: Maps to NAICS 238. Requires state trade licenses (Electrical/Plumbing/HVAC), EPA Section 608 refrigerant handling certs, and OSHA Fall Protection. UK: Requires HMRC CIS, statutory Gas Safe Register (for gas fitting), NICEIC/Part P electrical certification, and F-Gas compliance under UK SIC 43xxx.
What are the international classification equivalents and MCC code for 43.24?
Verified concordance for 43.24: US NAICS 2022: 238290 (Other Building Equipment Contractors), 238310 (Drywall and Insulation Contractors) • UK SIC 2007: 43290 (Other construction installation) • UN ISIC Rev. 5: 432 • Payment MCC 1711 (Special Trade Contractors (HVAC, Plumbing, Electrical)).
What was 43.24 under legacy NACE Rev. 2?
Under official Eurostat concordance, NACE Rev. 2.1 43.24 corresponds to NACE Rev. 2 43.29 (Other construction installation).
Which activities are excluded from NACE Rev. 2.1 43.24?
Official explanatory notes exclude: installation of industrial machinery, see 33.20.