Skip to content
NAICS 2022 238110 23811 ↗
● Official Registry Data: 2026-11-19

238110 — Poured Concrete Foundation and Structure Contractors

NAICS 2022 238110 (Poured Concrete Foundation and Structure Contractors) classifies within economic division 43 (Regulated by EU F-Gas certification (heat-pump & HVAC installers), EPBD renewable installer standards, and Asbestos/Construction directives), linking EU/UN activity boundaries with US NAICS, UK SIC, and national regulatory obligations.

01 / Standard & Revision
NAICS 2022

U.S. Census Bureau • v2022

02 / Parent Hierarchy
23811

Poured Concrete Foundation and Structure Contractors

03 / Mapped Standards
13

ISIC 4390

04 / Subclasses & Scope
1 Items

MCC 1611, 1711, 7349

01 / OFFICIAL SCOPE & OPERATORS

Activity Scope, Operators & Exclusions

Who Uses This Code & Typical Business Models

  • Demolition, excavation, piling, and site-preparation subcontractors
  • Electrical wiring, plumbing, HVAC, fire-sprinkler, and solar-panel installers
  • Plastering, drywall, tiling, roofing, glazing, and exterior insulation trades

This Class Includes

1
  • This industry comprises establishments primarily engaged in pouring and finishing concrete foundations and structural elements. This industry also includes establishments performing grout and shotcrete work. The work performed may include new work, additions, alterations, maintenance, and repairs.

Official Census Illustrative Examples

  • Concrete pouring and finishing
  • Gunite contractors
  • Concrete pumping (i.e., placement)
  • Mud-jacking contractors
  • Concrete work (except paving)
  • Shotcrete contractors
  • Footing and foundation concrete contractors

This Class Excludes (Cross-References)

0

—

02 / REGULATORY & TAX DOSSIER

Legislation, Licensing, Incorporation & Tax Framework

Div. 43 • Sec. F

Governing Statutes & Regulations

OHS Law No. 6331 (Very Hazardous — Mandatory MYK Certificates) Natural Gas & Electrical Utility Installer Rules Vocational Training Law No. 3308 Turkish VAT 4/10 Withholding

Mandatory Permits, Licenses & Authorities

  • Mandatory MYK Vocational Qualification Certificates (Law 6331 Art. 17) across electrical, plumbing, scaffolding, and finishing trades
  • Local Gas Distributor Certified Installer License for 43.22 gas piping & boiler hooks
  • Ministry Demolition Contractor Certificate (Y1/Y2/Y3) & Municipal Demolition Permit for 43.11

Incorporation Route & Chamber Registration

EU NACE Rev. 2.1 Framework
Regulated by EU F-Gas certification (heat-pump & HVAC installers), EPBD renewable installer standards, and Asbestos/Construction directives.
United States (IRS / SBA / NAICS)
Maps to NAICS 238. Requires state trade licenses (Electrical/Plumbing/HVAC), EPA Section 608 refrigerant handling certs, and OSHA Fall Protection.
United Kingdom (Companies House / HMRC)
Requires HMRC CIS, statutory Gas Safe Register (for gas fitting), NICEIC/Part P electrical certification, and F-Gas compliance under UK SIC 43xxx.

VAT, Withholding & Statutory Incentives

  • Construction subcontracting above statutory thresholds triggers 4/10 VAT withholding; check labor invoice rules under Law 5510 Art. 85.
  • Sole traders in specialized trades can incorporate rapidly, though every site team needs OHS Law 6331 compliance.

Cross-Border Regulatory Frameworks (EU / US / UK)

TR • Corporate & Tradesmen Registry

Chamber of Commerce / Industry — Electrical / Plumbing / Building Tradesmen Chamber (Law 5362)

EU / Global Technical Alignment

Regulated by EU F-Gas certification (heat-pump & HVAC installers), EPBD renewable installer standards, and Asbestos/Construction directives.

AUDIT & BOUNDARY CHECK

Classification Boundaries & Audit Risks

  • Installing third-party doors, HVAC units, or flooring belongs in Div. 43; manufacturing them in your own plant sits in Div. 25/31.
  • Carrying out gas work without distributor/Gas Safe authorization or wiring without certified electricians triggers immediate shutdowns.
04 / INTERNATIONAL CROSSWALK & MCC

Global Classification Passport

Verified structural and concordance mappings across EU, US, UK, UN, and national registries.

Payment Processing & ISO 18245 MCC Profile

Visa / Mastercard ISO 18245
MCC 1611
Standard Risk Tier
Highway, Street & Heavy Construction

Typically commercial contract billing; high-ticket card runs require contractual milestone verification.

MCC 1711
Standard Risk Tier
Special Trade Contractors (HVAC, Plumbing, Electrical)

Smooth POS approval when paired with signed work orders or completion receipts.

MCC 7349
Low Risk Tier
Cleaning, Maintenance and Janitorial Services

Low dispute rate for both B2B janitorial contracts and scheduled residential bookings.

05 / BOUNDARIES & COMPARISON

Critical Distinctions & Sibling Codes

Open Full Comparison Tool →

Critical Regulatory & Scope Boundaries vs. Adjacent Codes

Critical Regulatory & Scope Boundaries vs. Adjacent Codes
Compared CodeScope BoundaryRegulatory & Tax Impact
43.21 — Electrical Installation → Plumbing, gas & HVAC sit in 43.22; electrical wiring & lighting sit in 43.21.Unlicensed gas-fitting work carries severe criminal & civil liability.
238110 vs 238130

238130 — Framing Contractors

This industry comprises establishments primarily engaged in structural framing and sheathing using materials other than structural steel or concrete. The work performed may include new work, additions, alterations, maintenance...

238110 vs 238140

238140 — Masonry Contractors

This industry comprises establishments primarily engaged in masonry work, stone setting, bricklaying, and other stone work. The work performed may include new work, additions, alterations, maintenance, and repairs.

06 / TAXONOMY TREE

Classification Hierarchy & Data Export

07 / FAQ

Frequently Asked Questions

What business activities and models fall under NAICS 2022 238110?

238110 (Poured Concrete Foundation and Structure Contractors): This industry comprises establishments primarily engaged in pouring and finishing concrete foundations and structural elements. This industry also includes establishments performing grout and shotcrete work. The work performed may include new work, additions, alterations, maintenance, and repairs.. Typical operators: Demolition, excavation, piling, and site-preparation subcontractors; Electrical wiring, plumbing, HVAC, fire-sprinkler, and solar-panel installers.

What regulatory licensing and tax rules apply to 238110 across EU, US, UK, or Turkey?

EU: Regulated by EU F-Gas certification (heat-pump & HVAC installers), EPBD renewable installer standards, and Asbestos/Construction directives. US: Maps to NAICS 238. Requires state trade licenses (Electrical/Plumbing/HVAC), EPA Section 608 refrigerant handling certs, and OSHA Fall Protection. UK: Requires HMRC CIS, statutory Gas Safe Register (for gas fitting), NICEIC/Part P electrical certification, and F-Gas compliance under UK SIC 43xxx.

How does 238110 differ legally from 43.21 (43.21 — Electrical Installation)?

Plumbing, gas & HVAC sit in 43.22; electrical wiring & lighting sit in 43.21. Regulatory impact: Unlicensed gas-fitting work carries severe criminal & civil liability.

What are the international classification equivalents and MCC code for 238110?

Verified concordance for 238110: UN ISIC Rev. 5: 4390 • Payment MCC 1611 (Highway, Street & Heavy Construction).